Automatic Transfer Switch (ATS) Manufacturer (PC & CB Class · IEC 60947-6-1 · VOQ2 / VOQ3 / VOQ4)
Factory-direct dual-power automatic transfer switches for utility-to-generator, solar hybrid inverter, and commercial backup changeover. Compare all 8 VOQ series, simulate transfer break times, or generate an engineering RFQ spec in 30 seconds.
VIOX Dual Power ATS Series
VOQ4-63AE
VOQ4-63AE kettős teljesítményű automatikus átkapcsoló
- Névleges áram
- Up to 63 A
- Lengyelek
- 2P / 3P / 4P
- Szerelés
- 35 mm DIN-Rail
- Legjobb
- Residential & solar hybrid backup
VOQ4-80AE
VOQ4-80AE kettős teljesítményű automatikus átkapcsoló
- Névleges áram
- Up to 80 A
- Lengyelek
- 2P / 3P / 4P
- Szerelés
- 35 mm DIN-Rail
- Legjobb
- Higher-load home & inverter DBs
VOQ4-100E
VOQ4-100E kettős teljesítményű automatikus átkapcsoló
- Névleges áram
- Up to 100 A
- Lengyelek
- 2P / 3P / 4P
- Szerelés
- 35 mm DIN-Rail
- Legjobb
- Commercial sub-panels & EV backup
VOQ4-100R
VOQ4-100R kettős teljesítményű automatikus átkapcsoló
- Névleges áram
- Up to 100 A
- Lengyelek
- 2P / 3P / 4P
- Szerelés
- 35 mm DIN-Rail
- Legjobb
- Compact dual-source changeover
VOQ2-63
VOQ2-63 Kettős teljesítményű automatikus átkapcsoló
- Névleges áram
- Up to 63 A
- Lengyelek
- 2P / 3P / 4P
- Szerelés
- Panel Base Mount
- Legjobb
- Telecom & small commercial backup
VOQ3
VOQ3 kettős teljesítményű automatikus átkapcsoló
- Névleges áram
- 63 A – 3200 A Frames
- Lengyelek
- 3P / 4P
- Szerelés
- Switchboard Panel
- Legjobb
- Commercial buildings & main feeders
VOQ3-43
VOQ3-43 Dual Power Automatic Transfer Switch
- Névleges áram
- Commercial Frames
- Lengyelek
- 3P / 4P
- Szerelés
- Switchboard Panel
- Legjobb
- Standby generator & T1/T2/T3 delays
VOQ3-46
VOQ3-46 Kettős teljesítményű automatikus átkapcsoló
- Névleges áram
- Commercial Frames
- Lengyelek
- 3P / 4P
- Szerelés
- Switchboard Panel
- Legjobb
- Programmable dual-feeder changeover
Simulate ATS Switching Time & Load Ride-Through
Select any transfer architecture below to inspect the exact open-transition changeover sequence, interruption window, and which loads ride through without rebooting.
Real-World Load Compatibility
2P vs. 3P vs. 4P ATS — When Must You Switch the Neutral?
Incorrect neutral switching is the #1 cause of nuisance RCD trips and circulating earth currents on generator-backed switchboards. Verify your earthing scheme before ordering.
Rule 1 · Use 4P ATS for Generator & TT / TN-S RCD Boards
Separately grounded generators create a parallel neutral-earth path if neutrals remain tied together, tripping upstream RCDs on transfer. A 4P ATS cleanly isolates N₁ and N₂.
Rule 2 · Use 2P ATS for Single-Phase Solar Hybrid Inverters
On 230 V single-phase utility + inverter backup boards, a 2P DIN-rail ATS (VOQ4-63AE / 100E) disconnects both Line and Neutral so islanded inverter neutral bonding stays compliant.
Rule 3 · Use 3P ATS Only on TN-C (Never Break PEN)
IEC 60364 prohibits switching a combined Protective Earth & Neutral (PEN) conductor. Where PEN is present, specify 3P (2P / 3P / 4P Selection Guide →).
Why Standard ATS Units Fail in Real Panels — And How VIOX Engineers Around It
Most transfer-switch failures happen during real outages—when non-synchronized sources, inductive motor kickback, or miswired neutrals stress changeover contacts.
PC-Class Without Upstream Protection
Deploying a fast PC-class ATS without a matched upstream MCB or MCCB leaves transfer contacts exposed to catastrophic short-circuit energy.
Nuisance RCD Trips on Transfer
Using a 3P ATS between a utility transformer and a separately grounded generator creates parallel N-PE return paths that trip RCDs immediately.
Generator Hunting & Back-EMF Shock
Instant switching on 1-second grid dips cranks diesel gensets unnecessarily, while zero-delay return transfer slams spinning motors out of phase.
Contact Welding on Hybrid Solar
Undersized contacts weld shut during frequent grid-to-inverter changeover, risking simultaneous backfeed across both power sources.
PC-Class vs. CB-Class Selection Matrix & Market Benchmark
Confirm upstream protection and switching-window boundaries before selecting your VOQ series.
| Alkalmazási forgatókönyv | VIOX sorozat | Class & Switching Window | Limitations / Not Suitable For | Verification Check |
|---|---|---|---|---|
| Residential & Solar Hybrid Backup | VOQ4-63AE / 80AE / 100E / 100R | PC-Class DIN-Rail · 8–50 ms | No built-in short-circuit trip—must pair with upstream MCB vagy MCCB. | Verify inverter neutral bonding & 2P/4P pole count. |
| Commercial Building & Standby Generator | VOQ2-63 / VOQ3 / VOQ3-43 / VOQ3-46 | PC / CB Panel-Mount · Programmable delay | Confirm whether the generator controller requires 2-wire dry-contact auto-start. | Check coil control voltage (110/220/230 V AC) & cool-down timer. |
| Zero-Drop IT Racks / Medical Imaging | Pair with UPS or upgrade to STS | Solid-State STS (< 4 ms) | Mechanical ATS open-transition (8 ms–1.5 s) is not zero-drop (ATS vs. STS Guide →). | Confirm server PSU hold-up time or dual-corded UPS path. |
| Tier / Requirement | Tier-1 Reference (Socomec ATyS / ABB TruONE / ASCO) | VIOX VOQ2 / VOQ3 / VOQ4 Equivalent | Commercial & Panel Delta |
|---|---|---|---|
| Compact 63 A–100 A DIN-Rail ATS | Limited DIN-rail options; typically bulky panel-mount | VOQ4-63AE / 80AE / 100E / 100R | Mounts directly in standard modular DBs; 40%–60% lower BOM cost |
| Commercial Generator Changeover | Socomec ATyS d/g · ABB OTM/TruONE (10–18 wk lead time) | VOQ2-63 & VOQ3 Series (IEC 60947-6-1) | Faster factory delivery + custom delay & control-voltage options |
| Factory QC & Interlock Testing | Certified high-end QA | 100% Oscilloscope timing & dual-interlock cycle QC | Verified 8–20 ms fast / 50–100 ms std / CB motor transfer timing |
| OEM Private-Label & Panel Kitting | Not offered to independent regional brands | OEM Laser Logo + Matched MCB/MCCB/SPD Kit | Bundle ATS with VIOX MCB, MCCB, and SPD on one consolidated PO |
Mire jutunk őszintén
If a hospital or Tier-4 data center tender legally mandates UL 1008 sole-source ASCO or ABB TruONE with zero approved equivalents, stay with that Tier-1 unit. For IEC 60947-6-1 commercial buildings, solar hybrid backup panels, and generator OEMs needing 40%–60% savings, compact DIN-rail options, 100% oscilloscope QC, and faster delivery, the VIOX VOQ2/VOQ3/VOQ4 lineup is engineered for that role.
Build Your ATS Engineering Spec Summary in 30 Seconds
Click your site parameters below to auto-generate a clean engineering brief you can copy straight into your RFQ or attach directly to a VIOX quote request.
ATS engineering knowledge center
In-depth wiring, transfer-time, and generator changeover guides written for electrical engineers and panel builders.
Dual Power Automatic Transfer Switch: Working Principle, Types & Selection
Read guide →Single-Phase vs. Three-Phase ATS Selection Guide (2P, 3P & 4P)
Read guide →ATS vs. STS: Automatic Transfer Switch vs. Static Transfer Switch
Read guide →Hybrid Inverter ATS Wiring Guide: 2-Wire Start & Neutral Bonding
Read guide →Automatic Transfer Switch Wiring Diagram: Utility–Generator & Neutral
Read guide →ATS hibaelhárítási útmutató: Miért nem kapcsol át a transzferkapcsoló generátorra?
Read guide →ATS Selection, Switching Time & Procurement Questions
Direct answers on PC vs. CB class, 8 ms–1.5 s switching windows, 4P switched-neutral wiring, solar hybrid integration, and OEM factory supply.
PC vs CB How do I choose between a PC-Class and CB-Class Automatic Transfer Switch?
PC-Class ATS units (IEC 60947-6-1) use fast solenoid or contactor mechanisms for rapid switching (typically 8 ms–100 ms) and high electrical endurance, but do not include built-in short-circuit tripping—they require matched upstream MCB/MCCB protection.
CB-Class ATS units incorporate motorized circuit breakers with integrated overload and short-circuit protection, at the trade-off of slower mechanical transfer times (0.6 s–1.5 s).
Időzítés How does ATS switching time (8 ms, 50 ms, 0.6 s) affect real electrical loads?
Most modern switch-mode power supplies (SMPS) and LED drivers ride through brief interruptions under 16–20 ms, making fast PC-Class switches (8–20 ms) nearly seamless for lighting and light electronics.
Standard 50–100 ms and CB-Class 0.6–1.5 s transfers suit HVAC, pumps, and building distribution; mission-critical IT servers without dual PSUs still require a UPS or Static Transfer Switch (STS).
Semleges When must I choose a 4P (switched neutral) ATS instead of a 3P ATS?
Specify a 4P ATS whenever transferring between a utility grid and a separately grounded generator, or in TT/TN-S systems protected by RCDs and earth-fault relays—switching the neutral prevents parallel N-PE circulating currents and nuisance RCD trips.
Never use a 4P switch to break a combined PEN conductor in a TN-C system; specify a 3P ATS and keep PEN solidly bonded.
Solar / Gen Can VIOX ATS units switch between utility grid, solar hybrid inverters, and standby generators?
Yes. Compact DIN-rail VOQ4 models (63 A–100 A) handle grid-to-inverter transfer in residential and commercial solar backup panels, while VOQ2 and VOQ3 controller-equipped units support standby generators with programmable start/return delays and 2-wire generator start dry contacts.
ATS vs STS When should I use a Static Transfer Switch (STS) instead of a mechanical ATS?
Mechanical ATS units always have an open-transition break time (8 ms to 1.5 s). For zero-drop Tier-3/4 data center racks or sensitive medical imaging equipment that cannot tolerate even a half-cycle outage without a UPS, specify a solid-state Static Transfer Switch (STS) (< 4 ms) instead.
OEM / B2B What is VIOX’s sample policy, MOQ, and OEM customization scope for ATS orders?
VIOX supplies engineering validation samples for bench transfer-time and generator testing, mixed-SKU distributor batches across VOQ2, VOQ3, and VOQ4 series, and OEM customization including control voltages (110 V / 220 V / 230 V AC), laser faceplate marking, and private-label export cartons.
Share your RFQ spec summary from the 6-step builder above for matched factory pricing, lead times, and IEC 60947-6-1 documentation.
Need the Right Automatic Transfer Switch?
Erősítsük meg együtt.
Send your rated current, pole configuration (2P/3P/4P), transfer class (PC or CB), control voltage, and quantity. VIOX engineers will match the right VOQ2, VOQ3, or VOQ4 series.
Request ATS Quote