VIOX ELECTRIC
Nyelv

Automatic Transfer Switch (ATS) Manufacturer (PC & CB Class · IEC 60947-6-1 · VOQ2 / VOQ3 / VOQ4)

Factory-direct dual-power automatic transfer switches for utility-to-generator, solar hybrid inverter, and commercial backup changeover. Compare all 8 VOQ series, simulate transfer break times, or generate an engineering RFQ spec in 30 seconds.

PC & CB Class8 ms–1.5 s · IEC 60947-6-1
2P / 3P / 4PSwitched-Neutral TT / TN-S Ready
8 VOQ SeriesDIN-Rail 63–100 A & Panel Mount
VIOX VOQ4 Dual Power Automatic Transfer Switch on white studio background

VIOX Dual Power ATS Series

VOQ4-63AE kettős teljesítményű automatikus átkapcsoló
DIN-Rail · PC Class

VOQ4-63AE

VOQ4-63AE kettős teljesítményű automatikus átkapcsoló

Névleges áram
Up to 63 A
Lengyelek
2P / 3P / 4P
Szerelés
35 mm DIN-Rail
Legjobb
Residential & solar hybrid backup
VOQ4-80AE kettős teljesítményű automatikus átkapcsoló
DIN-Rail · PC Class

VOQ4-80AE

VOQ4-80AE kettős teljesítményű automatikus átkapcsoló

Névleges áram
Up to 80 A
Lengyelek
2P / 3P / 4P
Szerelés
35 mm DIN-Rail
Legjobb
Higher-load home & inverter DBs
VOQ4-100E kettős teljesítményű automatikus átkapcsoló
DIN-Rail · 100A Fast

VOQ4-100E

VOQ4-100E kettős teljesítményű automatikus átkapcsoló

Névleges áram
Up to 100 A
Lengyelek
2P / 3P / 4P
Szerelés
35 mm DIN-Rail
Legjobb
Commercial sub-panels & EV backup
VOQ4-100R kettős teljesítményű automatikus átkapcsoló
DIN-Rail · 100A Series

VOQ4-100R

VOQ4-100R kettős teljesítményű automatikus átkapcsoló

Névleges áram
Up to 100 A
Lengyelek
2P / 3P / 4P
Szerelés
35 mm DIN-Rail
Legjobb
Compact dual-source changeover
VOQ2-63 Kettős teljesítményű automatikus átkapcsoló
Panel-Mount · 63A

VOQ2-63

VOQ2-63 Kettős teljesítményű automatikus átkapcsoló

Névleges áram
Up to 63 A
Lengyelek
2P / 3P / 4P
Szerelés
Panel Base Mount
Legjobb
Telecom & small commercial backup
VOQ3 kettős teljesítményű automatikus átkapcsoló
Commercial · Heavy Duty

VOQ3

VOQ3 kettős teljesítményű automatikus átkapcsoló

Névleges áram
63 A – 3200 A Frames
Lengyelek
3P / 4P
Szerelés
Switchboard Panel
Legjobb
Commercial buildings & main feeders
VOQ3-43 Dual Power Automatic Transfer Switch
Generator Controller

VOQ3-43

VOQ3-43 Dual Power Automatic Transfer Switch

Névleges áram
Commercial Frames
Lengyelek
3P / 4P
Szerelés
Switchboard Panel
Legjobb
Standby generator & T1/T2/T3 delays
VOQ3-46 Kettős teljesítményű automatikus átkapcsoló
Programmable ATS

VOQ3-46

VOQ3-46 Kettős teljesítményű automatikus átkapcsoló

Névleges áram
Commercial Frames
Lengyelek
3P / 4P
Szerelés
Switchboard Panel
Legjobb
Programmable dual-feeder changeover
Interactive Sequence Visualizer

Simulate ATS Switching Time & Load Ride-Through

Select any transfer architecture below to inspect the exact open-transition changeover sequence, interruption window, and which loads ride through without rebooting.

Typical Open-Transition Break
8 – 20 ms
IEC 60947-6-1 · PC-Class Fast Solenoid

    Real-World Load Compatibility

    2P vs. 3P vs. 4P ATS — When Must You Switch the Neutral?

    Incorrect neutral switching is the #1 cause of nuisance RCD trips and circulating earth currents on generator-backed switchboards. Verify your earthing scheme before ordering.

    4P Switched Neutral (TT / TN-S + Generator) Közüzemi hálózat L1 L2 L3 + N₁ Generátor L1 L2 L3 + N₂ 4P ATS Breaks L1, L2, L3 & Isolates N₁ / N₂ RCD / Load Zero N-PE Loop WARNING — TN-C Systems (Combined PEN Conductor): Never switch a PEN conductor through a 4P ATS. Use a 3P ATS and keep PEN solidly bonded. For 230 V single-phase grid + hybrid solar inverter, specify a 2P ATS (L + N).

    Rule 1 · Use 4P ATS for Generator & TT / TN-S RCD Boards

    Separately grounded generators create a parallel neutral-earth path if neutrals remain tied together, tripping upstream RCDs on transfer. A 4P ATS cleanly isolates N₁ and N₂.

    Rule 2 · Use 2P ATS for Single-Phase Solar Hybrid Inverters

    On 230 V single-phase utility + inverter backup boards, a 2P DIN-rail ATS (VOQ4-63AE / 100E) disconnects both Line and Neutral so islanded inverter neutral bonding stays compliant.

    Rule 3 · Use 3P ATS Only on TN-C (Never Break PEN)

    IEC 60364 prohibits switching a combined Protective Earth & Neutral (PEN) conductor. Where PEN is present, specify 3P (2P / 3P / 4P Selection Guide →).

    Why Standard ATS Units Fail in Real Panels — And How VIOX Engineers Around It

    Most transfer-switch failures happen during real outages—when non-synchronized sources, inductive motor kickback, or miswired neutrals stress changeover contacts.

    01Fault Energy

    PC-Class Without Upstream Protection

    Deploying a fast PC-class ATS without a matched upstream MCB or MCCB leaves transfer contacts exposed to catastrophic short-circuit energy.

    VIOX EngineeringClear PC vs. CB labeling plus factory-coordinated MCB / MCCB backup tables.
    02RCD Trip

    Nuisance RCD Trips on Transfer

    Using a 3P ATS between a utility transformer and a separately grounded generator creates parallel N-PE return paths that trip RCDs immediately.

    VIOX EngineeringFull 4P switched-neutral VOQ2, VOQ3 & VOQ4 models verified for TT/TN-S panels.
    03Gen Hunting

    Generator Hunting & Back-EMF Shock

    Instant switching on 1-second grid dips cranks diesel gensets unnecessarily, while zero-delay return transfer slams spinning motors out of phase.

    VIOX EngineeringProgrammable T1/T2/T3 anti-flicker, return, and cool-down delays with 2-wire auto-start contacts.
    04Contact Weld

    Contact Welding on Hybrid Solar

    Undersized contacts weld shut during frequent grid-to-inverter changeover, risking simultaneous backfeed across both power sources.

    VIOX EngineeringSilver-alloy arc-resistant contacts with positive mechanical & electrical dual interlocking.

    PC-Class vs. CB-Class Selection Matrix & Market Benchmark

    Confirm upstream protection and switching-window boundaries before selecting your VOQ series.

    ATS architecture matrix with explicit limitations and verification checks
    Alkalmazási forgatókönyv VIOX sorozat Class & Switching Window Limitations / Not Suitable For Verification Check
    Residential & Solar Hybrid Backup VOQ4-63AE / 80AE / 100E / 100R PC-Class DIN-Rail · 8–50 ms No built-in short-circuit trip—must pair with upstream MCB vagy MCCB. Verify inverter neutral bonding & 2P/4P pole count.
    Commercial Building & Standby Generator VOQ2-63 / VOQ3 / VOQ3-43 / VOQ3-46 PC / CB Panel-Mount · Programmable delay Confirm whether the generator controller requires 2-wire dry-contact auto-start. Check coil control voltage (110/220/230 V AC) & cool-down timer.
    Zero-Drop IT Racks / Medical Imaging Pair with UPS or upgrade to STS Solid-State STS (< 4 ms) Mechanical ATS open-transition (8 ms–1.5 s) is not zero-drop (ATS vs. STS Guide →). Confirm server PSU hold-up time or dual-corded UPS path.
    Practical benchmark comparing VIOX VOQ ATS series against Socomec ATyS, ABB TruONE, and ASCO
    Tier / Requirement Tier-1 Reference (Socomec ATyS / ABB TruONE / ASCO) VIOX VOQ2 / VOQ3 / VOQ4 Equivalent Commercial & Panel Delta
    Compact 63 A–100 A DIN-Rail ATS Limited DIN-rail options; typically bulky panel-mount VOQ4-63AE / 80AE / 100E / 100R Mounts directly in standard modular DBs; 40%–60% lower BOM cost
    Commercial Generator Changeover Socomec ATyS d/g · ABB OTM/TruONE (10–18 wk lead time) VOQ2-63 & VOQ3 Series (IEC 60947-6-1) Faster factory delivery + custom delay & control-voltage options
    Factory QC & Interlock Testing Certified high-end QA 100% Oscilloscope timing & dual-interlock cycle QC Verified 8–20 ms fast / 50–100 ms std / CB motor transfer timing
    OEM Private-Label & Panel Kitting Not offered to independent regional brands OEM Laser Logo + Matched MCB/MCCB/SPD Kit Bundle ATS with VIOX MCB, MCCB, and SPD on one consolidated PO

    Mire jutunk őszintén

    If a hospital or Tier-4 data center tender legally mandates UL 1008 sole-source ASCO or ABB TruONE with zero approved equivalents, stay with that Tier-1 unit. For IEC 60947-6-1 commercial buildings, solar hybrid backup panels, and generator OEMs needing 40%–60% savings, compact DIN-rail options, 100% oscilloscope QC, and faster delivery, the VIOX VOQ2/VOQ3/VOQ4 lineup is engineered for that role.

    6-Step RFQ Spec Builder

    Build Your ATS Engineering Spec Summary in 30 Seconds

    Click your site parameters below to auto-generate a clean engineering brief you can copy straight into your RFQ or attach directly to a VIOX quote request.

    ATS Selection, Switching Time & Procurement Questions

    Direct answers on PC vs. CB class, 8 ms–1.5 s switching windows, 4P switched-neutral wiring, solar hybrid integration, and OEM factory supply.

    PC vs CB How do I choose between a PC-Class and CB-Class Automatic Transfer Switch?

    PC-Class ATS units (IEC 60947-6-1) use fast solenoid or contactor mechanisms for rapid switching (typically 8 ms–100 ms) and high electrical endurance, but do not include built-in short-circuit tripping—they require matched upstream MCB/MCCB protection.

    CB-Class ATS units incorporate motorized circuit breakers with integrated overload and short-circuit protection, at the trade-off of slower mechanical transfer times (0.6 s–1.5 s).

    Időzítés How does ATS switching time (8 ms, 50 ms, 0.6 s) affect real electrical loads?

    Most modern switch-mode power supplies (SMPS) and LED drivers ride through brief interruptions under 16–20 ms, making fast PC-Class switches (8–20 ms) nearly seamless for lighting and light electronics.

    Standard 50–100 ms and CB-Class 0.6–1.5 s transfers suit HVAC, pumps, and building distribution; mission-critical IT servers without dual PSUs still require a UPS or Static Transfer Switch (STS).

    Semleges When must I choose a 4P (switched neutral) ATS instead of a 3P ATS?

    Specify a 4P ATS whenever transferring between a utility grid and a separately grounded generator, or in TT/TN-S systems protected by RCDs and earth-fault relays—switching the neutral prevents parallel N-PE circulating currents and nuisance RCD trips.

    Never use a 4P switch to break a combined PEN conductor in a TN-C system; specify a 3P ATS and keep PEN solidly bonded.

    Solar / Gen Can VIOX ATS units switch between utility grid, solar hybrid inverters, and standby generators?

    Yes. Compact DIN-rail VOQ4 models (63 A–100 A) handle grid-to-inverter transfer in residential and commercial solar backup panels, while VOQ2 and VOQ3 controller-equipped units support standby generators with programmable start/return delays and 2-wire generator start dry contacts.

    ATS vs STS When should I use a Static Transfer Switch (STS) instead of a mechanical ATS?

    Mechanical ATS units always have an open-transition break time (8 ms to 1.5 s). For zero-drop Tier-3/4 data center racks or sensitive medical imaging equipment that cannot tolerate even a half-cycle outage without a UPS, specify a solid-state Static Transfer Switch (STS) (< 4 ms) instead.

    OEM / B2B What is VIOX’s sample policy, MOQ, and OEM customization scope for ATS orders?

    VIOX supplies engineering validation samples for bench transfer-time and generator testing, mixed-SKU distributor batches across VOQ2, VOQ3, and VOQ4 series, and OEM customization including control voltages (110 V / 220 V / 230 V AC), laser faceplate marking, and private-label export cartons.

    Share your RFQ spec summary from the 6-step builder above for matched factory pricing, lead times, and IEC 60947-6-1 documentation.

    Need the Right Automatic Transfer Switch?
    Erősítsük meg együtt.

    Send your rated current, pole configuration (2P/3P/4P), transfer class (PC or CB), control voltage, and quantity. VIOX engineers will match the right VOQ2, VOQ3, or VOQ4 series.

    Request ATS Quote